Analisis Waste Manhours pada Proses Perawatan C-Check Pesawat Airbus 330 dengan Metode Value Stream Mapping (VSM)

Authors

  • Christian Carlos Politeknik Penerbangan Indonesia Curug
  • Lilies Esthi Riyanti Politeknik Penerbangan Indonesia Curug
  • Muhammad Faridh Al Farisy Politeknik Penerbangan Indonesia Curug

DOI:

https://doi.org/10.55606/teknik.v6i1.8663

Keywords:

5W+1H, C-Check, Manhours, Root Cause Analysis (RCA), Value Stream Mapping (VSM)

Abstract

The MRO (Maintenance, Repair, and Overhaul) industry in Indonesia still faces challenges in efficiency, productivity, and global competitiveness, especially against international companies with more advanced technology. PT XYZ, as one of the largest MROs, continues to innovate and optimize aircraft maintenance processes to reduce manhours deviation and achieve Turn Around Time (TAT) targets in line with customer commitments. Uncontrolled increases in manhours lead to higher manhours cost and lower profitability. Form Analysis Profitability Maintenance (FAPM) is used to plan maintenance project profits, where manhours cost is the largest fixed cost. Of 36 C-Check Airbus A330 maintenances conducted between 2022–2024, only nine achieved the FAPM target. This study applies Value Stream Mapping (VSM) to analyze process flow and identify non value added activities. The results show the largest deviation occurred during the inspection phase, particularly in request for material (347.4 manhours) and request for tools and equipment (295.025 manhours), categorized as waste of waiting. Through Root Cause Analysis (RCA) and the 5 Why method, the main causes were data input errors, limited safety stock, suboptimal warehouse layout, and few vendors. Solutions using the 5W+1H approach are expected to reduce deviations, lower costs, and enhance company profitability.

References

Danastiningrum, A., & Akbar, M. I. (2019). Usulan perbaikan tingkat kepuasan kerja karyawan divisi HCGS & SHE dengan metode 5W1H di PT Kalimantan Prima Persada. Jurnal Rekayasa dan Optimasi Sistem Industri, 1(1), 25–31.

Fadil, R. (2021). Eksploitasi seksual komersial anak di Indonesia. Medan: Restu Printing Indonesia. Humanika: Jurnal Ilmiah Kajian Humaniora, 21(1), 33–54.

Faisal, & Purnawan, A. W. (2018). Using value stream mapping to support lean supply implementation: Aircraft engine maintenance. Jurnal Studi Teknik Industri, 20(2), 45–54.

Habsy, B. A., Mufidha, N., Shelomita, C., Rahayu, I., & Muckorobin, M. I. (2023). Filsafat dasar dalam konseling psikoanalisis: Studi literatur. Indonesian Journal of Educational Counseling, 7(2), 189–199.

Haekal, J., & Masood, I. (2023). Lean manufacturing approach in pipe center cross production process. In AIP Conference Proceedings 2680, 1–6.

Iqbal Hayatussalam, F., Riyanti, L. E., & Kurniawan, I. E. (2025). Analysis of turnaround time delays in C-Check of Airbus 330 aircraft using root cause analysis method. International Journal of Progressive Sciences and Technologies, 48(2), 652–662.

PT Garuda Maintenance Facility Aero Asia Tbk. (2024). Berita pers catatkan perbaikan finansial signifikan, GMF terus genjot profitabilitas. [Press release].

Sugiyono. (2019). Metode penelitian pendidikan: Pendekatan kuantitatif, kualitatif, dan R&D. Bandung: Alfabeta.

Trinchieri, I., Tridello, A., & Elbestawi, M. E. (2023). Politecnico di Torino. [Master’s thesis, Politecnico di Torino]. Institutional Repository of Politecnico in Torino.

Downloads

Published

2026-03-30

How to Cite

Christian Carlos, Lilies Esthi Riyanti, & Muhammad Faridh Al Farisy. (2026). Analisis Waste Manhours pada Proses Perawatan C-Check Pesawat Airbus 330 dengan Metode Value Stream Mapping (VSM). Jurnal Teknik Mesin, Elektro Dan Ilmu Komputer, 6(1), 137–160. https://doi.org/10.55606/teknik.v6i1.8663

Similar Articles

<< < 1 2 3 4 5 

You may also start an advanced similarity search for this article.