Pengaruh Alokasi Sumber Daya Proyek Terhadap Waktu Dan Biaya Menggunakan Metode Work Sampling Dengan Omax (Studi Kasus: Proyek Sekolah Menengah Analis Kimia Makassar)
DOI:
https://doi.org/10.55606/teknik.v6i2.11246Keywords:
Productivity, Work Sampling, OMAX, Forecasting, Inventory Control, Lot Sizing, Pylon Pin Rib, Turn Around Time, CostAbstract
Abstract. This research analyzes the impact of labor allocation on construction project time and cost using Work Sampling and Objective Matrix (OMAX) methods. The study is prompted by the classic issues of delays and cost overruns caused by inefficient resource allocation and low productivity.Using a quantitative observational approach, field data was processed through four OMAX stages: defining indicators (such as Labor Utilization Rate), scale normalization, weighting, and calculating productivity indices. The results indicate that combining these two methods effectively identifies limiting factors, such as material waiting times and field coordination issues.
The key finding shows a labor productivity index of 0.58 (58%), categorized as "good" but with room for improvement. The study demonstrates a causal relationship where optimized labor allocation directly boosts productivity, subsequently shortening duration and reducing costs. In conclusion, OMAX-based evaluation enables more precise resource management to minimize project risks.
References
Aji, P., & Nugroho, A. J. (2022). ANALISIS PENGUKURAN PRODUKTIVITAS BETON READY MIX DENGAN METODE OMAX ( OBJECTIVE MATRIX ) PADA PT PIONIRBETON INDUSTRI. 2(3).
Apdeni, R., Citra, Z., Wibowo, P. D., Malinda, Y., Sipil, T., Teknik, F., Padang, U. N., Sipil, T., Teknik, F., & Buana, U. M. (2022). OPTIMASI PROPORSI SUMBER DAYA PROYEK DENGAN MENGGUNAKAN APLIKASI JAVA PADA BANGUNAN KONSTRUKSI PABRIK. 9(3), 400–404.
Aulia, M. Z. (2021). PENERAPAN METODE CPM (CRITICAL PATH METHOD) PADA PROYEK KONSTRUKSI PEMBANGUNAN BENDUNGAN LAU-SIMEME PAKET II KAB. DELI SERDANG. 2(4), 1147–1152.
Avianda, D. E. A., & Yuniati, Y. (2014). Strategi Peningkatan Produktivitas di Lantai Produksi Menggunakan Metode Objective Matrix ( OMAX ) . 01(04), 202–213.
Bagaskara, J. S., & Triana, M. I. (2024). Analisis Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Pembangunan Perumahan Opra City Gresik Jawa Timur. 7(2). https://doi.org/10.31004/jutin.v7i2.28204
Djunaedi, Ramdan Yusuf, Mohammad Muslimin, M Alit Suryawan, D. W. (2025). PERAN MANAJEMEN SUMBER DAYA MANUSIA DALAM MENGURANGI TINGKAT TURNOVER PEKERJA PROYEK KONSTRUKSI. 14(September), 4235–4246. https://doi.org/10.34127/jrlab.v14i3.1838
Dr. I Made Darsana, S.E., M. M., Dr. Luluk Tri Harinie, S.E., M. M., Frankie Jan Salean, S.E., M. Р., Dr. Siti Nurmayanti, S.E., M. M., Dion Eko Prihandono, S.T., M. S., Ir. Nurul Aziza, М.Т., IРM., A. E., Dr. Susriyanti, S.E., M.M., C. L., Hendrato Setiabudi Nugroho, S.E., M.Si., C., & Heriasman, S.Т., М. T. (2024). MANAJEMEN PROYEK.
Fadjar, A. (2025). Resource Utilization and Repetitive Construction Scheduling using the Discrete Event Simulation Method. 15(2), 20702–20708.
Felix, J., Studi, P., Teknik, S., Tarumanagara, U., Studi, P., Teknik, M., & Tarumanagara, U. (2023). Merubah rangkaian kegiatan paralel menjadi berurutan dengan metode alokasi sumber daya yang terbatas. 6(1), 97–108.
Gracellia Thenu, Felix Taihuttu, M. K. (2019). ANALISIS PRODUKTIVITAS PEKERJA KONSTRUKSI PADA PEKERJAAN BETON BERTULANG. 9(2), 220–225.
Hartono, W., Hartanto, A., Handayani, D., Studi, P., Sipil, T., & Maret, U. S. (2024). ANALISIS FAKTOR YANG MEMPENGARUHI RANTAI PASOK MATERIAL PROYEK PEMBANGUNAN GEDUNG DI KOTA SURAKARTA. 7(3), 179–194.
Indriani, Y., Sari, R. K., Marwa, S., Studi, P., Teknik, S., Teknik, F., Pahlawan, U., Tambusai, T., Studi, P., Teknik, S., Teknik, F., Pahlawan, U., & Tambusai, T. (2024). Journal of Engineering Science and Technology Objective Matrix ( OMAX ) Analysis to Determine Production Productivity. 4(1), 27–32.
Isnubroto, D., & Putri, C. K. (2024). PADA PROYEK KONSTRUKSI MENGGUNAKAN MICROSOFT PROJECT ( Studi Kasus Pekerjaan Struktur Proyek XYZ ).
Juli, N., & Ramadhan, F. F. (2023). PENGUKURAN PRODUKTIVITAS BETON READY MIX DENGAN METODE OMAX ( OBJECTIVE MATRIX ). 3(2), 245–257.
Keintjem, C. G., Walangitan, D. R. O., & Malingkas, G. Y. (2024). Analisis Produktivitas Tenga Kerja Pada Pekerjaan Balok Dan Plat Lantai Dengan Menggunakan Metode Work Sampling Pada Proyek Pembangunan. 22(87).
Kotimah, K., & Aryanny, E. (2023). Productivity Improvement of Production Unit Using Objective Matrix ( OMAX ) Method at PT . X. 4(3), 588–596. https://doi.org/10.22441/ijiem.v4i3.21437
Lalujan, A. N., Studi, P., Teknik, S., Tarumanagara, U., Studi, P., Teknik, S., & Tarumanagara, U. (2022). ANALISIS PRODUKTIVITAS TENAGA KERJA PADA PEKERJAAN PENULANGAN DI KOTA MANADO DENGAN METODE WORK SAMPLING. 5(3), 661–670.
Liespono, A., & Tjendani, H. T. (2022). ANALISIS PRODUKTIVITAS TENAGA KERJA DENGAN METODE WORK SAMPLING PADA PROYEK PEMBANGUNAN PERUMAHAN PAKUWON CITY. 9–21.
Mandaku, H., Afifudin, M. T., & Parera, G. C. (2024). Penerapan Metode Critical Path Method (Cpm) Pada Penjadwalan Reparasi Kapal Patroli Xvi 2012. Jurnal Mitra Teknik Industri, 3(1), 12–19. https://doi.org/10.24912/jmti.v3i1.29720
Meylisa E. Balirante, Ariestides K. T. Dundu, G. Y. M. (2025). Optimalisasi Sumber Daya Biaya Pada Proyek Peningkatan Jalan Tiwa’a Kecamatan Morowali Utara, Kabupaten Morowali Utara. 22(88).
Prakoso, S. H. (2024). Analisis Produktivitas Tenaga Kerja Proyek Konstruksi Pekerjaan Shear Wall dengan Metode Work Sampling. 30(1). https://doi.org/10.36309/goi.v30i1.264
Prasetyo, D. A., Chandra, H. P., & Ratnawidjaja, S. (2023). ANALISIS PRODUKTIVITAS TENAGA KERJA DENGAN METODE WORK SAMPLING : STUDI KASUS PROYEK TUNJUNGAN PLAZA 6. 1–8.
Rohim, M., Setyaning, L. B., & Setiawan, A. (2025). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pemasangan Keramik Menggunakan Metode Work Sampling ( Studi Kasus : Proyek Rehabilitasi Dan Renovasi SD N 2 Kalegen Kabupaten Magelang ). 9(28).
Soeharto, I. (1999). Manajemen Proyek. II.
Sumaila, R. M., Mende, J., Sutrisno, A., Teknik, J., Fakultas, M., Universitas, T., & Ratulangi, S. (n.d.). PENERAPAN METODE OMAX UNTUK ANALISIS PRODUKTIVITAS DI PT . EQUIPORT INTI INDONESIA BITUNG Jurnal Tekno Mesin / Volume 10 Nomor 1. 10, 16–21.
Wibisono, D. (2019). Analisis Produktivitas Dengan Menggunakan Pendekatan Metode Objective Matrix ( OMAX ) Studi Kasus di PT . XYZ. 1(1), 1–7.
Yanti, G. (2021). PRODUKTIVITAS TENAGA KERJA DENGAN METODE WORK. 100–106.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Jurnal Teknik Mesin, Elektro dan Ilmu Komputer

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.