Analisis Tata Letak Fasilitas Perusahaan Terhadap Produktivitas Kerja dengan Prinsip 5S dan ARC
Studi Kasus : CV. Tata Jaya Sablon
DOI:
https://doi.org/10.55606/jimek.v5i2.6476Keywords:
5S, ARC, Displacement Distance, Displacement Moment, Facility LayoutAbstract
CV. Tata Jaya Sablon is a textile enterprise that manufactures a diverse array of apparel, including t-shirts, shirts, polos, jackets, and other garments. This organization employs several people who sew and execute different stages of the manufacturing process daily. Field observations indicate that the manufacturing process entails a protracted workflow inside a constrained production area. This research seeks to provide an optimal manufacturing facility layout to foster a productive and efficient work environment. This research used the 5S approach (seiri, seiton, seiso, seiketsu, shitsuke) to enhance space efficiency and provide a recommended layout informed by the ARC diagram. The findings of this analysis indicate that the organization's 5S implementation score attained 75%, thereby earning the designation "Quite Good". Nevertheless, seiri and seiton received the lowest scores; so, it is imperative to establish a designated place for unnecessary items and to create a specific space for organizing essential commodities required for the manufacturing process. The ARC findings indicate that the recommended plan has enhanced the efficiency of movement duration or distance by 29.21%.
References
Alghushan, A. A., Nuruddin, M., & Dahda, S. S. (2022). Proposed improvement of facility layout in production area in UD. Arshaindo using the From To Chart (FTC) method. Journal of Applied Engineering and Technological Science, 4(1), 333–341. https://doi.org/10.37385/jaets.v4i1.1118
Ambika, S., Professor, A., & Vasanth Kumar, D. (2013). Performance enhancement in a print pack firm by layout optimization. International Journal of Engineering Research and Applications, 3(2), 237–244.
Hartari, E., & Herwanto, D. (2021). Perancangan tata letak stasiun kerja dengan menggunakan metode Systematic Layout Planning. Jurnal Media Teknik dan Sistem Industri, 5(2), 118. https://doi.org/10.35194/jmtsi.v5i2.1480
Mauriza, L., & Nurbani, S. N. (2021). Implementasi metode Systematic Layout Planning dalam perbaikan tata letak fasilitas produksi injeksi di PT. Lucas Djaja. Rekayasa Industri dan Mesin (ReTIMS), 2(2), 1. https://doi.org/10.32897/retims.2021.2.2.1207
Pattiapon, & Marcy, L. N. E. M. (2021a). Perancangan ulang tata letak fasilitas produksi dengan ongkos material handling. Jurnal Teknik Industri, 15(2). (Catatan: Perlu ditambahkan nama jurnal dan halaman jika tersedia.)
Primasari, I., & Hidayanto, A. (2022). Perancangan area kerja lantai produksi berdasarkan metode 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke). Prosiding Seminar Nasional Ilmu Sosial dan Teknologi, 4(56), 352–356.
Rahman, I., Arianto, M. F., & ‘Aini, Y. (2021). Pengaruh penerapan 5R (housekeeping) terhadap perilaku keselamatan dan kesehatan kerja (K3) pada perawat di ruangan perawatan. Windows of Health, 4(4), 289–295.
Rizkina Arifin, R., & Andesta, D. (2023). Analisis penerapan Seiri, Seiton, Seiso, Seiketsu dan Shitsuke di Departement Open Store PT XYZ. Jurnal Serambi Engineering, 8(4), 7101–7110. https://doi.org/10.32672/jse.v8i4.6768
Siregar, T., Kasih Asmarani, B., Alichia, C., & Magdalena. (2021). Implementasi budaya 5R (Ringkas, Rapi, Resik, Rawat, dan Rajin) pada kelompok belajar binaan Komplek Kodam Jatiwaringin. Prapanca: Jurnal Abdimas, 1(2), 44–50. https://doi.org/10.37826/prapanca.v1i2.123
Widjajanto, T., Rahman, A., & Perdana, S. (2020). Penerapan 5S di Kantor Pos Jakarta Pusat. Prosiding Seminar Nasional Pengabdian Masyarakat LPPM UMJ, September 2019.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Jurnal Ilmu Manajemen, Ekonomi dan Kewirausahaan

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.